Parish Paths Report

Footpath

Issue/Date notified

Current status

Action required

2BR

Ridden horses don’t like using the bridle bridge and consider the approaches to the ford too steep. Date: prior 2007

Designs drawn up by Bridges team for modifying angle of approaches. Environment Agency has given their initial approval, but requires more information

Obtain further details and revised quotes from contractors.

issue c big02

Locked gate between these paths and county road (access possible via Kent carriage gap alongside Date: prior 2007

 

Continue negotiation:

isssue d big

Locked gate (access possible via stile alongside) Date: prior 2007

The old gate is still not secured back / removed.

Continue negotiation:

9FP

Crops not cleared wide enough

Cleared by harvest. Further complaint received Autumn 2007.

To be inspected.

9FP

Two waymark post collapsed, either side of pheasant cover. Date 22/9/07

Ordered for replacement.

 

10FP

Not reinstated after ploughing. Date 22/9/07

To be inspected.

To be inspected.

10FP

More waymark posts required. Date 22/9/07

To be inspected.

To be inspected.

issue a big

Locked gate (access possible via kissing gate alongside) Date: prior 2007

The owner has pulled out of meetings and has involved the county councillor and indicated involving the MP.  Last letter 25/3/08 requiring site meeting.

Continue negotiation:

issue b big

Locked gate (access possible via gap alongside) Date: prior 2007

County Solicitors consulted. They require another land search. The initial part is back from land registry. Computer at Land Registry now needs to be checked as title numbers known.

Authorised person to access Update solicitors:

issue e big

Two fence obstructions (access possible via permissive path) Date: prior 2007

The residents submitted new evidence that has been researched by Council. Site meeting arranged with residents for 27/3/08 where path is to be marked for them to clear voluntarily.

Continue-negotiation: 27/3/08 - site meeting concluded with Gilston residents voluntarily agreeing to open the path as indicated by RoW. They will be erecting a fence along the southern edge of the path for their security. They will be providing a timetable and consulting the planners with regards to the height.

20FP

Obstructed by broad beans Date 22/9/07

Path now cleared 2m + Resolved. Further complaint received Autumn 2007

To be inspected

20FP

More waymarks required. Date 22/9/07

To be inspected

To be inspected

27RB

Waymark post collapsed. Date 2/1/08

New post ordered.

 

32FP

Path flooded deeply every Winter. Date.26/11/07

Long stretch under many inches of water. Adjoining footpath 31 also affected.

Installing a boardwalk is only solution, but this would be very expensive. Currently applying for grants for this work. Considering using volunteer labour.